bg_image

Minerals And Mining (Health, Safety And Technical Regulations, 2012) (L.I. 2182)

Regulation 270

(1) A manager of a mine shall before the construction work on a tailings storage facility in the mine submit to the Inspectorate Division for approval the initial operating plan of the tailings storage facility which plan shall consist of
(a) an engineering design report;
(b) an operating plan;
(c) a monitoring plan;
(d) a water management and cyanide management plan;
(e) an emergency preparedness plan; and
(f) a preliminary closure plan.
(2) The preliminary closure plan shall provide safety measures to deal with unforeseen events which may occur.

Subject : Health (Mining)  

Procedure to Follow


Not Avaiable

Responsible Institution


Minerals Commission

36 Second Cantonments Cl, Accra

Online System

Link Unavailable

Fees/ charges

Not Avaiable